Energy T & D
From Poletop to 600 KVDC
- Parallel Redundancy Protocol, PRP
- High-availability Seamless Redundancy, HSR
- Both are standardized redundancy protocols for industrial automation networks that require zero recovery time.
- PRP/HSR products are suitable for electrical substation automation and mission-critical applications that cannot tolerate any system downtime.
- IEC 62439-3 Clause 4 = PRP
- IEC 62439-3 Clause 5 = HSR
Start configure your solution, and we will be happy to assist you. We do it every day
GE - General Electric
Project
Power Substation Automation
End user
N/A
Consultant
GE
Contractor
GE
Description
N-Ergie
Project
Electricity Network Monitoring and Metering
End user
N-ergie Germany
Client
ABB
Description
Powell Industries
Project
Power Substation Automation
End user
BP
Consultant
Powell Industries
Description
Statkraft - Norway
Project
Hydro Power Plant Management
End user
Statkraft Norway
Consultant
Alstom
Description
BOTAS - Turkey
Project
Power Substation Automation
End user
BOTAS Turkey
Consultant
SPP Engineering
Description
Tedas - Turkey
Project
Power Substation Automation
End user
Tedas, Turkey
Contractor
SPP Engineering Ltd.
Consultant
SPP Engineering Ltd.
Description
Electricity Supply Board - Ireland
Project
Energy Management
End user
Electricity Supply Board (ESB) Ireland
Consultant
EFT Ireland
Description
Sanofi - Aventis
Project
Power Station Automation
End user
Sanofi-Aventis
Description
GE Energy – uk
Project
Power Substation Automation
End user
N/A
Consultant
GE
Contractor
GE
Period
2020
Description
Substation Automation. The project is based on RTU32M with 61850 Client and standard I/O modules
GE ENERGY – SPAIN
Project
Power Substation Automation
End user
N/A
Consultant
GE
Contractor
GE
Period
2015
Description
BOTAS – TURKEY
Project
Power Substation Automation
End user
BOTAS
Consultant
SPP ENGINEERING LTD.
Contractor
SPP ENGINEERING LTD.
Period
2013-2014
Description
POWELL Industries – UK
Project
Power Substation Automation
End user
BP
Consultant
Powell Industries
Contractor
Powel Industries
Period
2014-2015
Description
SANOFI-AVENTIS – FRANCE
Projec
Power Substation Automation
End user
Sanofi-Aventis
Consultant
N/A
Contractor
N/A
Period
Description
AREVA – GERMANY
Project
10kV Switch
End user
Consultant
N/A
Contractor
N/A
Period
2003
Description
ABB – GERMANY
Project
Various Power Distribution Applications
End user
Consultant
Contractor
Period
Description
CEGELEC – PHILIPPINES
Project
Monitoring Power Stations
End user
N/A
Consultant
N/A
Contractor
Cegelec
Period
2003
Description
ALSTOM – NORWAY
Project
Hydro Power Plant Management
End user
Statkraft, Norway
Consultant
N/A
Contractor
Alstom
Period
2008
Description
STADTWERKE HAGEN – GERMANY
Project
Metering, GSM
End user
Stadtwerke Hagen
Consultant
N/A
Contractor
N/A
Period
2001 to 2002
Description
RWE – GERMANY/AUSTRIA
Project
Remote Metering, Transformer Metering & Control
End user
RWE
Consultant
N/A
Contractor
N/A
Period
2002
Description
NPOWER – UK
Project
Precipitator Monitoring
End user
NPower
Consultant
PIACS
Contractor
N/A
Period
2000 to date
Description
EFT – IRELAND
Project
Energy Management
End user
Electricity Supply Board customers
Consultant
EFT – Ireland
Contractor
N/A
Period
2002 to date
Description
N-ERGIE – GERMANY
Project
Remote Metering, Transformer Monitoring & Control
End user
N-ergie
Consultant
N/A
Contractor
ABB
Period
2001 to 2003
Description
EFT – IRELAND
Project
Energy Management
End user
Electricity Supply Board customers
Consultant
EFT – Ireland
Contractor
N/A
Period
2002 to date
Description
YEDAS – TURKEY
Project
Power Substation Automation
End user
Yedas
Consultant
GE (General Electric)
Contractor
GE (General Electric)
Period
2013-2014
Description
TEDAS – TURKEY
Project
Power Substation Automation
End user
TEDAS
Consultant
SPP ENGINEERING LTD.
Contractor
SPP ENGINEERING LTD.
Period
2012-2013
Description
Video Training
Code Generator
Test Tool for 60870-5-104, 101, 104. Simulate SCADA and get to commissioning with a tested solution. Get password from sales. The test tool is not free. Our engineers has spend time on it, so you can free up yours.
- EN/IEC60870 Configurator User Guide
- RTU32/IEC61850 Server Presentation
- RTU32/IEC61850 Client Presentation
- RTU32/EN/IEC60870 Presentation
- RTU32 IEC60870-5-101 Interoperability doc
- RTU32 IEC60870-5-104 Interoperability doc
- RTU32 DNP3 Slave Device Profile
- OPC UA User Guide
- Siemens S7 Client User Guide
- Getting started with 61850 Client