Run the Whole Pump Station from One Platform
NJORD-VAR combines dedicated pump control with a modern industrial RTU. One platform runs the station logic, the local HMI, the data logging and the link to SCADA, for water, wastewater, reservoir, well and industrial pumping applications.
Three operating modes · Protection in every mode · SCADA ready · Built on the RTU32M
One Screen, the Whole Station
The overview screen carries the current station level, the status of every pump, the operating mode and any active alarms. An operator should not have to move between screens to understand the condition of the station.
On the overview screen
- Live station level against the configured start and stop points
- Per-pump status, mode and running state at a glance
- Inflow and outflow values on the same view
Configured, Not Re-engineered
The same platform suits a two pump lift station and a large reservoir because the behaviour is set in parameters rather than rewritten in code. Site differences are handled on the configuration screen.
Set per site
- Number of pumps at the site, and the maximum allowed to run together
- Start delay, stop delay and run feedback delay
- Maximum runtime, anti short cycle time, dry run delay and pump fault timer
Pumps Follow the Level
As the level reaches the first configured start point the duty pump runs. If the level keeps rising, each further start level brings in the next available pump, up to the maximum number permitted to run at once. When the level falls, pumps stop in the configured sequence.
How staging works
- Separate start levels, a high level and a low level cut off
- Additional pumps staged to the configured thresholds
- Duty rotation spreads operating hours across the available pumps
A Faulted Pump Does Not Stop the Station
Protection is part of the controller rather than something layered on top, and it stays in force in every operating mode. Changing between Auto, Manual and Remote does not bypass it.
Protection in force
- Low level cut off, overload and pump trip, dry run and run feedback failure
- A faulted pump is locked out and the next available pump is selected
- The operator gets the corresponding alarm, not just a general station fault
What Happened, Where, and When
At an unmanned station, knowing that something went wrong is not enough. NJORD-VAR keeps an event history so maintenance and operations can reconstruct the sequence instead of guessing at it.
Recorded per pump
- Pump starts, stops, faults, trips and run feedback changes, each timestamped
- Runtime and number of starts recorded per pump, so imbalance shows up early
- Historical level trend and flow information
Pump Controller and Station RTU in One
NJORD-VAR is built on the Brodersen RTU32M, so the same device that runs the pumps also talks to the control centre — removing the separate layer of telemetry equipment a dedicated pump controller would normally need beside it. For new stations, and for retrofit where an older dedicated controller is reaching the end of its life.
Three operating modes · Protection in every mode · SCADA ready · Built on the RTU32M
- Water, wastewater, reservoir, well and industrial pumping
- Duty rotation and runtime balancing as standard
- Reports into the Brodersen fleet platform where several stations are managed together
- Deploy in minutes
What You Can Configure
Every value below is set on the station configuration screen. No two sites need the same numbers.
| Setting | What it controls |
|---|---|
| Number of pumps at this site | How many pumps the station logic manages |
| Maximum number of pumps allowed to run | Ceiling on how many run at the same time, whatever the level does |
| Start levels, high level, low level cut off | The level thresholds that stage pumps in and out |
| Start delay | Delay before a pump starts once its level point is reached |
| Stop delay | Delay before a pump stops as the level falls |
| Maximum runtime allowed | Longest a single pump may run before the controller acts |
| Anti short cycle time | Minimum gap between starts, to stop rapid cycling |
| Dry run delay | How long a dry run condition must persist before it is treated as a fault |
| Run feedback delay | How long to wait for run confirmation before raising a feedback failure |
| Pump fault timer | How long a fault condition must hold before the pump is locked out |
| Priority mode | Selects how the next pump to run is chosen |
| Pump rating, runtime and start counters | Set per pump; counters can be reset after maintenance |
Where It Is Used
| Application | What NJORD-VAR handles |
|---|---|
| Water and wastewater lift stations | Level based staging, duty rotation, dry run and overload protection, SCADA reporting |
| Industrial pump stations | Process pumping with runtime balancing and local HMI supervision |
| Reservoirs and wells | Level control with historical trend and flow information |
| Retrofit of an existing station | Replaces a standalone pump controller, the RTU, the local HMI and the data logger with one platform |