In a heavy industrial plant, a drop in electrical frequency is a warning that demand has outrun supply. Left unchecked, an under-frequency event can cascade into a full process shutdown in seconds. The classic defence is Under-Frequency Load Shedding, shedding non-critical loads fast enough to keep frequency up and the critical process alive. The hard part is adding that intelligence to a plant that is already built, without tearing out the protection and switchgear you already trust. That is where a brownfield approach, and the RTU32M, come in.
What happens in an under-frequency event
Electrical frequency is a live balance between generation and load. When a grid disturbance or a lost generator pulls supply below demand, frequency starts to fall. Every large motor and process in the plant feels it. If nothing acts quickly, protection relays begin tripping in an uncontrolled way, and the whole facility can go dark.
For a refinery, a smelter or a chemical plant, an unplanned shutdown is not just lost production. It can be a safety event, and the restart can take days. The answer is to shed load deliberately and in the right order: drop the loads you can live without, fast, so frequency recovers and the loads you cannot live without keep running.
The brownfield problem: keep the switchgear
Most industrial substations are brownfield. The protection relays, breakers and switchgear are already installed, commissioned and working. Ripping them out to add a modern load-shedding scheme is expensive, slow and risky. In many plants it simply is not practical, and the outage required to do it is itself unacceptable.
So the goal is not to replace the protection system. It is to add a coordinated automation layer alongside it, one that watches frequency, decides what to shed, and drives the existing breaker trip circuits. Keep the switchgear. Add the intelligence.
How the RTU32M adds UFLS as a layer
The RTU32M sits beside the existing protection and provides a plant-level UFLS automation layer. It uses IEC 61131-3 control logic to execute fast, staged and prioritised load-shedding strategies, interfacing with the protection, breaker trip circuits and plant signals that are already in place.
Because the whole cycle from detection to breaker action runs in milliseconds, the scheme can catch a fast-falling frequency and stabilise it before protection relays start tripping loads at random. The result is a controlled response, not a scramble.
What the scheme actually connects to
In a brownfield installation the wiring list is usually shorter than people expect. The layer needs three things:
- A frequency source. Either measured directly or taken from the existing protection relays already watching the incomer.
- Breaker trip and status. Outputs into the existing trip circuits of the breakers that feed the sheddable loads, and status inputs back so the scheme knows what actually opened.
- Plant context. Generator status, tie breaker position, and which loads are currently running, so the scheme sheds what is actually on rather than what it assumes is on.
That last point matters more than it sounds. A scheme that sheds a breaker which was already open achieves nothing, and the frequency keeps falling while the logic believes it has acted.
Deciding what gets shed, and in what order
This is where most of the real engineering time goes, and it is not a software problem. Before any logic is written, operations and electrical engineering have to agree a priority list: which loads can be dropped without anyone noticing, which can be dropped at the cost of output, and which must never be dropped at all.
Frequency thresholds for each stage are set against the local grid code and the plant’s own generation, so they differ from site to site. What does not differ is the discipline: the list has to be agreed, written down, and revisited whenever the plant changes. A priority list that reflects the plant as it was five years ago is worse than no list, because it will be executed with confidence.
Where UFLS schemes go wrong
Four failure modes come up repeatedly, and none of them are about the controller.
- Shedding too much. An over-aggressive scheme drops more load than the deficit requires, frequency overshoots upward, and the plant is left running on far less than it needed to lose. Staging exists precisely to avoid this.
- A stale priority list. New loads get installed and never classified. They sit in whatever group they were wired into, which may be the wrong one.
- Shedding something protected. A load that was non-critical when the list was written has quietly become essential, and nobody updated the classification.
- Never testing it. A scheme that has not been tested since commissioning is an assumption, not a protection. It should be proven on a planned outage, not discovered during a real event.
Why the RTU32M fits an industrial substation
A load-shedding layer is only as good as the platform under it. It has to be fast, it has to stay up, and it has to survive the environment of a working plant.
The fast logic engine and I/O scan give the scheme the speed it needs. HSR and PRP deliver zero-recovery-time network redundancy for mission-critical architectures, and IEC 61850 support lets it combine with modern substation communication. It interfaces cleanly with the installed switchgear, runs on hot-swappable, redundant, wide-temperature hardware, and is cybersecure by design under IEC 62443. The existing protection stays in place. The RTU32M adds the coordinated automation and redundancy layer around it.
Where it matters most
Brownfield UFLS is built for facilities where an under-frequency event turns into a process shutdown, and where replacing the switchgear is not an option:
- Refineries and chemical plants, keeping critical processes running through a disturbance.
- Metals, mining and smelting, avoiding unplanned shutdowns of high-consequence equipment.
- Pharma and other continuous-process industries, protecting product and safety.
- Industrial substations that need to be resilient and available, without a rebuild.
You do not have to choose between a modern load-shedding scheme and the switchgear you already trust. With the RTU32M, the frequency disturbance is detected, the decision is made and the right loads are shed in milliseconds, all on a layer that sits alongside your existing protection.
Build your RTU in the online configurator → Talk to Brodersen about UFLS →