SIGN ME UP

High-speed trains Norway by Aventi & Beijer

Read artichele here Project by Aventi & BeijerHigh-speed trains directly between Oslo and Ski. Travel time is halved from 22 to 11 minutes. The 20 kilometers long tunnel will be the Nordic region longest of its kind. Norway’s largest transport project is located at inner part of the InterCity southeast of Oslo. Under the auspices of

Read More »

Photovoltaic Installation In Tunisia

French system integrator JS automation selected the Brodersen RTU32M platform for the 10 MW Tozeur Photovoltaic solar power plant in Tunisia This massive project consists of 28994 Photovoltaic panels connected to 5 LV/MV transformer stations. These LV/MV stations are connected to a 33 kV substation which in hand is connected

Read More »

Brodersen & CODRA DNP3 WEBINAR

SAVE THE DATE Thursday, May 27th,2021 at 11:00 a.m. (London Time) – Webinar about Standard IEC 61850. In this webinar, in partnership with Codra and Julien Egalon, we invite you to discover the IEC 61850 standard and how it can be integrated into your SCADA application. Are you involved in

Read More »